Jonathan Miller Design produces one day animation for Anderson Hallas Architects

As part of their presentation, Anderson Hallas Architects needed a short animation that showcased a new entry design for the McNichols Civic Center Building in downtown Denver . With only 1 day to craft the animation I worked closely with David Miller from AHA to develop a sequence that showed the current entry being removed and the new entry falling in from above piece by piece. It was important to AHA that the animation communicated the path of people so an arrow was chosen to float up the stairs and then through the building painted with an X-Ray texture. The building model was supplied by AHA as were the two different entry ways and this helped speed up the process of key framing all the different pieces into place. The animation was done in 3-D Studio Max and video compositing done Adobe Premier Pro.